Services
Field work, documents and reporting for stormwater and wastewater permits. Use us for one task or the whole program.

Sampling and testing
We track qualifying storms, sample on site weekly, monthly or quarterly as your permit requires, test turbidity and pH in the field and deliver samples to an accredited lab. Results are checked against your permit's benchmarks and limits.
Inspections
Monthly industrial inspections, weekly construction inspections by CESCL-certified staff and quarterly sand and gravel inspections, written up on the forms Ecology expects.
SWPPP, SMP and pollution prevention plans
New plans, annual reviews, amendments and site map updates. We visit the site, identify pollutant sources and write a plan your staff can actually follow.
Corrective actions
Level 1 source control reviews, Level 2 structural BMP plans and Level 3 treatment responses, with deadlines tracked. For engineering reports that need a PE stamp, we work alongside a licensed engineer. Where exceedances come from natural background or off-site sources, we prepare the technical report.
Discharge Monitoring Reports and annual reports
Quarterly and monthly DMRs and annual reports prepared and filed through Secure Access Washington, with reminders well ahead of each deadline.
NOIs and permit changes
Notices of Intent, coverage modifications, NOI corrections, transfers, new sample points and Notices of Termination.
Binder and records audits
We check your on-site permit binder against what the permit requires and fill the gaps from the records we hold.
Training
Annual SWPPP training for industrial staff, online with a certificate for your records. About training
Every permit and report we handle
Each has its own page with what the requirement is and what we do for it.
Permits and reports
- Industrial Stormwater General Permit
- Construction Stormwater General Permit
- Sand & Gravel General Permit
- Winery General Permit
- Air emissions reports
- Alaska MSGP
- City sewer discharge permits
- Conditional No Exposure
- Dangerous waste annual reports
- King County Industrial Waste permits
- Oregon 1200-Z
- Pollution prevention plans
- Private stormwater facility inspections
- Sand & Gravel annual report
- SPCC plans
- State Waste Discharge permits
- Storm drain solids sampling
- TESC plans and inspections
- Tier II reporting
- Tier II, TRI and dangerous waste reports
- TRI Form R reporting
- UIC drywell registration
- Wastewater discharge permits
Services
What we don't do
We are compliance consultants, not engineers, so treatment system design is done with or by a licensed PE. We don't camera-inspect storm lines and will refer you to a firm that does. On construction sites, BMP installation stays with the contractor.
Want a price for your site?
Email us the site address and what you need, plus the permit number if you have it. We reply within one business day with a plan and a quote.
