Ecology State Waste Discharge permit reporting
Facilities that discharge wastewater to land or to a sewer under an Ecology State Waste Discharge permit have monitoring and paperwork on a fixed schedule. We run it for you.

Your State Waste Discharge Permit's monitoring schedule sets each sampling period and DMR due date.
Send us the permit's monitoring schedule and your last DMR.

The requirement
Ecology issues State Waste Discharge permits for industrial wastewater discharged to land, to groundwater or to a sewer where Ecology permits the discharge. Each permit sets limits, monitoring and reporting.
Who it applies to
Facilities that discharge industrial wastewater to land or to a sewer under an Ecology permit.
What we handle
- Wastewater sampling and lab coordination
- Monthly, quarterly and semiannual DMRs in Ecology's reporting system
- Groundwater monitoring wells, crop and soil sampling for land application sites
- Irrigation and crop management plans
- Annual permit items such as O&M manual reviews, flow meter calibration records and spill control plan reviews
- DMR confirmations sent to you after each filing
What these permits usually require
- Wastewater sampling on a monthly, quarterly or semiannual schedule
- Discharge Monitoring Reports in Ecology's system, with no-discharge periods coded correctly
- For land application: irrigation season limits, application rates, monitoring wells and soil and crop sampling
- Annual items such as an operations and maintenance manual review, flow meter calibration and a spill control plan review
How we keep it on track
We build a checklist from your permit's monitoring tables so each month's DMR has every required point, parameter and field reading. Where something wasn't sampled, the DMR says why, backed by a dated photo or log.
After each filing we send you the DMR confirmation, and we track the annual items with your staff so the evidence is on file before Ecology asks.
Common questions
Where are State Waste Discharge DMRs filed?
Electronically through Ecology's reporting system, on the schedule in your permit.
Do land application sites need groundwater monitoring?
Often, yes. Many permits for discharges to land require monitoring wells and soil or crop sampling. Your permit lists what applies.
Start with the permit's monitoring schedule
Email us the permit's monitoring schedule and your last DMR, and where the site is. We reply within one business day.
