Cities and counties often require a Temporary Erosion and Sediment Control (TESC) plan and proof that the controls are in place. We prepare both.

Dec 15 CSGP DMR for last month due 19 days left
Then Jan 15 CSGP DMR for last month due · Feb 15 CSGP DMR for last month due

Full 12-month calendar
Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.
Every month: CESCL inspection weekly and within 24 hours of any discharge
November 2026
- 15 Filing: CSGP DMR for last month due
December 2026
- 15 Filing: CSGP DMR for last month due
January 2027
- 15 Filing: CSGP DMR for last month due
February 2027
- 15 Filing: CSGP DMR for last month due
March 2027
- 15 Filing: CSGP DMR for last month due
April 2027
- 15 Filing: CSGP DMR for last month due
May 2027
- 15 Filing: CSGP DMR for last month due
June 2027
- 15 Filing: CSGP DMR for last month due
July 2027
- 15 Filing: CSGP DMR for last month due
August 2027
- 15 Filing: CSGP DMR for last month due
September 2027
- 15 Filing: CSGP DMR for last month due
October 2027
- 15 Filing: CSGP DMR for last month due
Source: 2026 Construction Stormwater General Permit (Ecology), S4.B and S5.B.
The requirement
Local grading and building permits often require a Temporary Erosion and Sediment Control plan and inspections showing the controls are in place before and during construction.
Who it applies to
Construction projects that disturb soil, where the city or county requires it.
What we handle
- TESC plans for permit applications
- Verification inspections by CESCL-certified staff
- Inspection letters for the city or county
- Coordination with your Construction Stormwater General Permit SWPPP
What a TESC plan covers
- Clearing limits and phasing
- Silt fence, inlet protection, construction entrances and stabilization
- Stockpile and dewatering management
- Inspection and maintenance responsibilities during construction
Verification inspections
Before or during grading, many cities want written confirmation that the controls in the approved plan are built and working. Our CESCL-certified staff inspect the site and write the letter the city asks for.
Common questions
Is a TESC plan the same as a construction SWPPP?
No. A TESC plan is usually a local permit requirement; a SWPPP is required by the Construction Stormwater General Permit. Many sites need both, and we keep them consistent.
Sources
Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.
Start with the site plan
Email us the site plan and grading permit, and where the site is. We reply within one business day.