Home / Services

TESC plans and verification inspections

Cities and counties often require a Temporary Erosion and Sediment Control (TESC) plan and proof that the controls are in place. We prepare both.

Silt fence installed on a slope
Next construction stormwater deadline Filing

Dec 15 CSGP DMR for last month due 19 days left

Then Jan 15 CSGP DMR for last month due · Feb 15 CSGP DMR for last month due

Get help before Dec 15
Silt fence installed on a slope
Full 12-month calendar

Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.

Every month: CESCL inspection weekly and within 24 hours of any discharge

November 2026

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: CSGP DMR for last month due

December 2026

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

January 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

February 2027

SMTWTFS12345678910111213141516171819202122232425262728
  • 15 Filing: CSGP DMR for last month due

March 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

April 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: CSGP DMR for last month due

May 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

June 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: CSGP DMR for last month due

July 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

August 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

September 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: CSGP DMR for last month due

October 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: CSGP DMR for last month due

Source: 2026 Construction Stormwater General Permit (Ecology), S4.B and S5.B.

The requirement

Local grading and building permits often require a Temporary Erosion and Sediment Control plan and inspections showing the controls are in place before and during construction.

Who it applies to

Construction projects that disturb soil, where the city or county requires it.

What we handle

  • TESC plans for permit applications
  • Verification inspections by CESCL-certified staff
  • Inspection letters for the city or county
  • Coordination with your Construction Stormwater General Permit SWPPP

What a TESC plan covers

  • Clearing limits and phasing
  • Silt fence, inlet protection, construction entrances and stabilization
  • Stockpile and dewatering management
  • Inspection and maintenance responsibilities during construction

Verification inspections

Before or during grading, many cities want written confirmation that the controls in the approved plan are built and working. Our CESCL-certified staff inspect the site and write the letter the city asks for.

Common questions

Is a TESC plan the same as a construction SWPPP?

No. A TESC plan is usually a local permit requirement; a SWPPP is required by the Construction Stormwater General Permit. Many sites need both, and we keep them consistent.

Sources

Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.

Start with the site plan

Email us the site plan and grading permit, and where the site is. We reply within one business day.