Oregon 1200-Z industrial stormwater compliance

For Oregon facilities under DEQ's 1200-Z industrial stormwater permit, we run the reporting and keep your Stormwater Pollution Control Plan current.

Industrial waterfront on the Willamette River in Portland
Next Oregon 1200-Z deadline Filing

Nov 30 Updated Stormwater Pollution Control Plan due to DEQ or its agent (one-time update to the 2026 permit, unless a later date was approved) 4 days left

Then Dec 31 Sampling window closes: two qualifying samples taken July 1 to December 31, generally at least 14 days apart · Feb 15 Quarterly DMR due for October to December

Get help before Nov 30
Industrial waterfront on the Willamette River in Portland
Full 12-month calendar

Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.

Every month: Monthly visual monitoring during a discharge

November 2026

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: Quarterly DMR due for July to September
  • 30 Filing: Updated Stormwater Pollution Control Plan due to DEQ or its agent (one-time update to the 2026 permit, unless a later date was approved)

December 2026

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 31 Sampling window: Sampling window closes: two qualifying samples taken July 1 to December 31, generally at least 14 days apart

January 2027

SMTWTFS12345678910111213141516171819202122232425262728293031

    February 2027

    SMTWTFS12345678910111213141516171819202122232425262728
    • 15 Filing: Quarterly DMR due for October to December

    March 2027

    SMTWTFS12345678910111213141516171819202122232425262728293031

      April 2027

      SMTWTFS123456789101112131415161718192021222324252627282930

        May 2027

        SMTWTFS12345678910111213141516171819202122232425262728293031
        • 15 Filing: Quarterly DMR due for January to March

        June 2027

        SMTWTFS123456789101112131415161718192021222324252627282930
        • 30 Sampling window: Sampling window closes: two qualifying samples taken January 1 to June 30, generally at least 14 days apart

        July 2027

        SMTWTFS12345678910111213141516171819202122232425262728293031

          August 2027

          SMTWTFS12345678910111213141516171819202122232425262728293031
          • 15 Filing: Quarterly DMR due for April to June, with the Tier 2 geometric mean evaluation

          September 2027

          SMTWTFS123456789101112131415161718192021222324252627282930

            October 2027

            SMTWTFS12345678910111213141516171819202122232425262728293031

              Source: 2026 1200-Z Industrial Stormwater Discharge Permit (Oregon DEQ), effective July 1, 2026: Condition I.3.b (SWPCP update), Schedule B.28.f and Table 6 (sampling), Schedule B.35 and Table 7 (DMRs).

              The requirement

              Oregon DEQ's 2026 1200-Z permit requires a Stormwater Pollution Control Plan, monthly visual monitoring, two qualifying stormwater samples in each half-year for applicable benchmark and impairment pollutants, and quarterly discharge monitoring reports. Existing permittees must submit an updated plan to DEQ or its agent by November 30, 2026, unless a later date was approved.

              Who it applies to

              Industrial facilities in Oregon that discharge stormwater to surface water or a storm sewer.

              What we handle

              • Discharge monitoring reports to DEQ or your city agent
              • Stormwater Pollution Control Plan (SWPCP) audits and updates
              • Quarterly site walks and binder reviews
              • Coordination with your Washington sites if you operate in both states

              How we run an Oregon program

              • Monthly check-ins for visual monitoring forms and lab reports
              • DMRs prepared for your signature, filed in Your DEQ Online or mailed with a wet signature where the city agent requires it
              • Proof of filing kept with each report
              • Quarterly site walks and binder reviews
              • Stormwater Pollution Control Plan updates, including the 2026 permit update

              Common questions

              When are 1200-Z DMRs due?

              Quarterly, under Schedule B.35 and Table 7 of the 2026 permit: November 15 (July to September), February 15 (October to December), May 15 (January to March) and August 15 (April to June). A DMR is required even when there was no discharge in the quarter.

              When is the updated SWPCP due?

              Existing permittees that want uninterrupted coverage must submit an updated Stormwater Pollution Control Plan to DEQ or its agent by November 30, 2026, unless DEQ or the agent approved a later date (Condition I.3.b). If you missed it, submit the updated plan now and ask DEQ or your agent whether a later date can be approved.

              How many samples does the 1200-Z require?

              For applicable benchmark and impairment pollutants, four samples a year: two qualifying samples between July 1 and December 31 and two between January 1 and June 30, generally at least 14 days apart (Schedule B.28.f and Table 6). Missed samples need a monitoring variance request filed with the February 15 or August 15 DMR.

              Sources

              Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.

              Related

              Start with your last DMR

              Email us your last DMR or the SWPCP, and where the site is. We reply within one business day.