Home / Services

Discharge Monitoring Reports and annual reports

Most Washington stormwater permits are reported electronically through Secure Access Washington. We prepare the reports, check them against your lab data and file them on time.

Laptop and notebook for reporting
Next Washington DMR and annual report deadline Filing

Dec 1 Winery: Q3 DMR due 5 days left

Then Jan 30 Sand & Gravel: Annual report due (active, non-portable sites) · Jan 30 Sand & Gravel: Q4 DMR due

Get help before Dec 1
Laptop and notebook for reporting
Full 12-month calendar

Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.

Every month: Construction stormwater (CSGP) DMR for last month due by the 15th

November 2026

SMTWTFS123456789101112131415161718192021222324252627282930
  • 15 Filing: ISGP: Q3 DMR due (July to September)

December 2026

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 1 Filing: Winery: Q3 DMR due

January 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 30 Filing: Sand & Gravel: Annual report due (active, non-portable sites)
  • 30 Filing: Sand & Gravel: Q4 DMR due

February 2027

SMTWTFS12345678910111213141516171819202122232425262728
  • 15 Filing: ISGP: Q4 DMR due (October to December)

March 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 1 Filing: Winery: Q4 DMR due
  • 15 Filing: ISGP: Annual Gross Revenue Form due

April 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 30 Filing: Sand & Gravel: Q1 DMR due

May 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: ISGP: Annual report due
  • 15 Filing: ISGP: Q1 DMR due (January to March)

June 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 1 Filing: Winery: Q1 DMR due

July 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 30 Filing: Sand & Gravel: Q2 DMR due

August 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 15 Filing: ISGP: Q2 DMR due (April to June)

September 2027

SMTWTFS123456789101112131415161718192021222324252627282930
  • 1 Filing: Winery: Q2 DMR due

October 2027

SMTWTFS12345678910111213141516171819202122232425262728293031
  • 30 Filing: Sand & Gravel: Q3 DMR due

Source: 2025 ISGP, 2026 CSGP, 2026 Sand and Gravel General Permit and 2024 Winery General Permit.

The requirement

Permits require monitoring results to be reported on a fixed schedule, usually as Discharge Monitoring Reports filed every period even when nothing discharged, plus an annual report. ISGP DMRs are due February 15, May 15, August 15 and November 15, and the annual report May 15.

Who it applies to

Every permitted facility that monitors stormwater or wastewater.

What's included

  • ISGP quarterly DMRs, due February 15, May 15, August 15 and November 15
  • ISGP annual reports, due May 15
  • Monthly construction stormwater DMRs
  • Sand and gravel and winery DMRs and production reports
  • Filing for you, or preparing reports for you to sign and submit when your permit requires it
  • Help registering for and getting into SAW

How a reporting cycle runs

  • Lab and field results collected and checked against your permit's limits and benchmarks
  • The DMR prepared in Secure Access Washington, including no-discharge periods coded correctly
  • A notice to your signer that it's ready, then reminders until it's submitted
  • The submitted DMR and confirmation saved to your shared folder

Who submits

Your permit's authorized signer submits in Secure Access Washington. Where you've delegated it, we submit; otherwise we prepare everything so the signer only has to review and sign.

Common questions

Can you submit reports for us?

Yes, when you authorize us in Ecology's system. Some reports must be signed by the permittee; we prepare those so you only review and submit.

Who signs DMRs?

The person your permit names as signatory, in Secure Access Washington. We prepare and check the report so they only need to sign.

What if a DMR is late?

A late or missing DMR is a permit violation. File it as soon as possible; we can catch up past-due reports.

Sources

Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.

Start with your last DMR

Email us your last DMR or the lab results for the period, and where the site is. We reply within one business day.