Stormwater sampling for permitted sites

We watch the forecast, get to your site during a qualifying storm, collect the samples your permit requires and get them to an accredited lab within hold times.

Field scientist collecting a stormwater sample
Next sampling deadline Sampling window

Dec 31 Q4 sampling window closes 35 days left

Then Mar 31 Q1 sampling window closes · Jun 30 Q2 sampling window closes

Get help before Dec 31
Field scientist collecting a stormwater sample
Full 12-month calendar

Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.

Every month: Construction sites: weekly turbidity or transparency sampling while discharging

November 2026

SMTWTFS123456789101112131415161718192021222324252627282930

    December 2026

    SMTWTFS12345678910111213141516171819202122232425262728293031
    • 31 Sampling window: Q4 sampling window closes

    January 2027

    SMTWTFS12345678910111213141516171819202122232425262728293031

      February 2027

      SMTWTFS12345678910111213141516171819202122232425262728

        March 2027

        SMTWTFS12345678910111213141516171819202122232425262728293031
        • 31 Sampling window: Q1 sampling window closes

        April 2027

        SMTWTFS123456789101112131415161718192021222324252627282930

          May 2027

          SMTWTFS12345678910111213141516171819202122232425262728293031

            June 2027

            SMTWTFS123456789101112131415161718192021222324252627282930
            • 30 Sampling window: Q2 sampling window closes

            July 2027

            SMTWTFS12345678910111213141516171819202122232425262728293031

              August 2027

              SMTWTFS12345678910111213141516171819202122232425262728293031

                September 2027

                SMTWTFS123456789101112131415161718192021222324252627282930
                • 1 Sampling window: ISGP: first fall storm sampling season starts
                • 30 Sampling window: Q3 sampling window closes

                October 2027

                SMTWTFS12345678910111213141516171819202122232425262728293031

                  Source: 2025 ISGP as modified (S4.B) and 2026 CSGP (S4.C, S4.D).

                  The requirement

                  Stormwater permits require samples from each discharge point on a set schedule. Under the Industrial Stormwater General Permit that is once a quarter plus the first fall storm. Under the Construction Stormwater General Permit it is weekly while the site discharges: turbidity with a meter on sites of 5 acres or more, turbidity or transparency on smaller sites, and pH only where significant concrete work, recycled concrete or engineered soils apply. Results are compared to the permit's benchmarks or limits.

                  Who it applies to

                  Facilities and construction sites covered by the ISGP, CSGP, Sand & Gravel, Oregon 1200-Z or Alaska MSGP permits.

                  What's included

                  • Tracking forecasts and deciding when a storm qualifies under your permit
                  • Sampling at each discharge point listed in your SWPPP
                  • Turbidity and pH measured in the field, the rest delivered to an accredited lab
                  • Bottles, preservation and hold times handled for you
                  • Results checked against your permit's benchmarks or limits, with a plain note on what they mean
                  • Data ready for your Discharge Monitoring Report

                  Who it's for

                  Facilities under the Industrial Stormwater General Permit (one sample per quarter), construction sites under the CSGP, and sand and gravel operations. We also sample wastewater and stormwater under city, county and individual permits.

                  Common questions

                  Can our own staff collect samples?

                  Yes. Many clients sample themselves and use us for the lab coordination, review and reporting. We can train your staff on the method.

                  Who analyzes the samples?

                  An Ecology-accredited laboratory. Field parameters such as pH and turbidity are measured on site with calibrated meters.

                  What if it's dry, or we miss the sample in a quarter?

                  Under the ISGP a DMR is due every quarter either way (Condition S9). No discharge: report “no discharge during the quarter.” Discharge but no sample: report “no sample obtained” with a written reason. Samples belong in the first 12 hours of a discharge; if that isn't possible, sample as soon as practicable and document why. We track the forecast so a window isn't missed.

                  Start with your last lab result

                  Email us your last lab result and the permit number, and where the site is. We reply within one business day.