Stormwater sampling for permitted sites
We watch the forecast, get to your site during a qualifying storm, collect the samples your permit requires and get them to an accredited lab within hold times.

Dec 31 Q4 sampling window closes 35 days left
Then Mar 31 Q1 sampling window closes · Jun 30 Q2 sampling window closes

Full 12-month calendar
Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.
Every month: Construction sites: weekly turbidity or transparency sampling while discharging
November 2026
December 2026
- 31 Sampling window: Q4 sampling window closes
January 2027
February 2027
March 2027
- 31 Sampling window: Q1 sampling window closes
April 2027
May 2027
June 2027
- 30 Sampling window: Q2 sampling window closes
July 2027
August 2027
September 2027
- 1 Sampling window: ISGP: first fall storm sampling season starts
- 30 Sampling window: Q3 sampling window closes
October 2027
Source: 2025 ISGP as modified (S4.B) and 2026 CSGP (S4.C, S4.D).
The requirement
Stormwater permits require samples from each discharge point on a set schedule. Under the Industrial Stormwater General Permit that is once a quarter plus the first fall storm. Under the Construction Stormwater General Permit it is weekly while the site discharges: turbidity with a meter on sites of 5 acres or more, turbidity or transparency on smaller sites, and pH only where significant concrete work, recycled concrete or engineered soils apply. Results are compared to the permit's benchmarks or limits.
Who it applies to
Facilities and construction sites covered by the ISGP, CSGP, Sand & Gravel, Oregon 1200-Z or Alaska MSGP permits.
What's included
- Tracking forecasts and deciding when a storm qualifies under your permit
- Sampling at each discharge point listed in your SWPPP
- Turbidity and pH measured in the field, the rest delivered to an accredited lab
- Bottles, preservation and hold times handled for you
- Results checked against your permit's benchmarks or limits, with a plain note on what they mean
- Data ready for your Discharge Monitoring Report
Who it's for
Facilities under the Industrial Stormwater General Permit (one sample per quarter), construction sites under the CSGP, and sand and gravel operations. We also sample wastewater and stormwater under city, county and individual permits.
Common questions
Can our own staff collect samples?
Yes. Many clients sample themselves and use us for the lab coordination, review and reporting. We can train your staff on the method.
Who analyzes the samples?
An Ecology-accredited laboratory. Field parameters such as pH and turbidity are measured on site with calibrated meters.
What if it's dry, or we miss the sample in a quarter?
Under the ISGP a DMR is due every quarter either way (Condition S9). No discharge: report “no discharge during the quarter.” Discharge but no sample: report “no sample obtained” with a written reason. Samples belong in the first 12 hours of a discharge; if that isn't possible, sample as soon as practicable and document why. We track the forecast so a window isn't missed.
Sources
Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.
Start with your last lab result
Email us your last lab result and the permit number, and where the site is. We reply within one business day.