Storm drain solids sampling for Puget Sound sediment cleanup sites
The Industrial Stormwater General Permit adds storm drain solids sampling for facilities that discharge to listed Puget Sound sediment cleanup sites. We plan the sampling and file the report.

Feb 15 If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR 81 days left
Then May 15 If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR · Aug 15 If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR

Full 12-month calendar
Starting November 2026, updated daily. Filing = a report is due. Sampling window = last day to collect a required sample. Event-triggered = only applies if something happened. Dates on a weekend or holiday can shift, and your coverage letter or agent may set site-specific dates.
November 2026
- 15 Event-triggered: If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR
December 2026
January 2027
February 2027
- 15 Event-triggered: If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR
March 2027
April 2027
May 2027
- 15 Event-triggered: If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR
June 2027
July 2027
August 2027
- 15 Event-triggered: If solids were sampled last quarter: Solids Monitoring Report and lab report due with this DMR
September 2027
October 2027
Source: 2025 ISGP as modified, S6.C (Puget Sound Sediment Cleanup Sites) and S9.
The requirement
The ISGP requires facilities that discharge to certain Puget Sound sediment cleanup sites to sample the solids in their storm drains and report the results to Ecology.
Who it applies to
ISGP facilities that discharge to a listed Puget Sound sediment cleanup site.
What we handle
- Confirming whether your discharge points fall under the requirement
- Collecting storm drain solids samples and coordinating the lab
- Coordinating line cleaning with your contractor
- Solids monitoring reports filed with Ecology
Which waters this covers
The requirement applies to ISGP facilities that discharge, directly or through a storm drain system, to listed Puget Sound sediment cleanup sites, the sediment-listed portions of Budd Inlet (Inner), Commencement Bay (Inner and Outer), the Duwamish Waterway (including East and West Waterways), Eagle Harbor, Elliott Bay, Everett/Port Gardener, Hood Canal (North), Liberty Bay, Port Gamble Bay, Oakland Bay/Shelton Harbor, Port Angeles Harbor, Sinclair Inlet, Thea Foss Waterway and Bellingham Bay (Inner).
What has to be done
- Sample the solids that build up in your own drainage system at least once per permit term, before the lines are cleaned
- Clean the inlets, catch basins, sumps, lines and oil/water separators at least once per permit term, without letting anything discharge
- Dispose of the removed solids properly
- File a solids monitoring report with the lab results in Secure Access Washington
- Under the modified 2025 ISGP, both must be done by December 31, 2028
Common questions
Which sites have to sample storm drain solids?
ISGP facilities that discharge to listed Puget Sound sediment cleanup sites. Your permit coverage identifies whether this applies.
Does the storm line have to be cleaned?
Yes, at least once in the permit term, unless Ecology approves a waiver through a modification of coverage with a technical basis such as video inspection or in-line solids sampling. Waiver requests are due May 15, 2028 (Condition S6.C).
When are solids results reported?
On a Solids Monitoring Report, with the lab report attached, no later than the DMR due date for the quarter in which the solids were sampled. Sampling and line cleaning must be done by December 31, 2028, when the permit term ends.
Sources
Checked against these agency documents on November 26, 2026. Reviewed by Jason Ghaffari, CPSWQ, CHMM on November 26, 2026. Your permit and the agency are the final word.
Start with Ecology's letter
Email us Ecology's letter or the permit condition that requires the sampling, and where the site is. We reply within one business day.