SWPPP preparation and updates
Your Stormwater Pollution Prevention Plan is the document Ecology reads first. We write plans your staff can follow and keep them current as your site changes.

Update the SWPPP when the site, its activities or its drainage change, or when a corrective action calls for new BMPs.
Send us your current SWPPP and site map.

The requirement
A Stormwater Pollution Prevention Plan describes the site, its pollutant sources and the practices used to control them. It must be kept on site, followed and updated as the site changes.
Who it applies to
Every facility covered by the ISGP or CSGP. Sand & Gravel sites keep a Site Management Plan and Oregon sites a Stormwater Pollution Control Plan, which we also prepare.
What's included
- Site visit to map drainage, discharge points and pollutant sources
- Best Management Practices chosen for your operations
- Sampling plan, inspection schedule and training requirements
- Site map creation or update
- Annual reviews and amendments after site changes or corrective actions
- Site Management Plans for sand and gravel sites and pollution prevention plans for wineries
What goes into a SWPPP
- A site map with drainage areas, discharge points and sample locations
- An inventory of industrial activities and materials exposed to stormwater
- Source control, operational and treatment best management practices
- Sampling, inspection, spill response and training procedures
- The signed certification and the records the permit requires
Keeping it current
We review the plan each year and whenever the site, its activities or a corrective action changes what's needed. Updated pages and site maps go into the on-site binder and your shared folder.
Common questions
How often does a SWPPP need updating?
Whenever the site, its operations or the permit changes, and after corrective actions that change your BMPs. A yearly review catches most of it.
When does a SWPPP need to be updated?
Whenever the site changes in a way that affects stormwater, when a corrective action calls for it, and whenever the permit requires a new version.
Does a construction project need a SWPPP?
Yes. Every site covered by the Construction Stormwater General Permit needs one on site before work begins.
Start with your current SWPPP
Email us your current SWPPP and site map, and where the site is. We reply within one business day.
